Li Xiaoqing

undefined                            

     Professor

       Phone: 13667129780

     Email: xql@mail.hust.edu.cn

     Academic Areas: Geotechnical Engineering

     Research Interests:Geotechnical-Strengthening Technology, Tunnel and Metro Engineering Technology, Pavement and Roadbed Engineering Theory and Technology, Oriented Drilling Trenchless Technology of Underground Pipeline-Laying

Academic Degrees

Ph. D. Geological Engineering,1999,China University of Geoscience.
M.S. Geotechnical Engineering, 1992,China University of Geoscience.
B.S. Exploring Engineering, 1986,Wuhan College of Geology.

Professional Experience

2012/04-Present:Professor & Supervisor for Ph. D.
School of Civil Engineering and Mechanics, HUST
2011/03-2012/03:Vistor & Professor. School of Civil and Environmental Engineering
University of New South Walse, Australia
2001/07-2011/02:Associate Professor / Professor & Supervisor for Ph. D. 
School of Civil Engineering and Mechanics, HUST
1999/08-2001/06:Postdoctoral Research Fellow, Associate Professor
School of Civil Engineering Harbin Institute of Technology, Harbin, P.R.C.
1992/08-1999/07:Lecturer, School of Engineering
China University of Geoscience(Wuhan)P.R.C.
1986/07-1989/09:Construction Engineer
Hubei Irrigating and Power Engineering Co. Ltd. Wuhan, P.R.C.

Selected Publications

1. Research on the Faulted Fracture Zone Tunnel Excavation and Restrictive Waterproof and Drainage Technology under the High Water Level(No.201502022),2016/01-2017/12.
2. Research on the Failure Mechanism and Prevention Technology of Pavement Settlement under the Viaduct(2015-44), 2015/12-2017/12.
3. National Science and Technology Supporting Program for “the Eleventh 5-years plan”:Research on Key Geotechnical-Strengthening Technology in Excavation Engineering (2008BAJ06B03-01). 2008/01-2010/12
4. NSFC:Research on the Static and Dynamic Mechanical Properties and Mechanism of Action of the FRP Soil Nail(51278391),2013/01-2017/12.
5. Research on the Construction Monitoring Measurements of High Filling Embankment of Wuhan Tianhe Airport Second Channel Highway. 2011/09-2015/12,
6. Research on the Asphalt Composition Structure of the Aging Resistance Pavement, 2014.4-2015.12
7. Research on Construction Behavior of Surround-rock and Stability of Lining Structure and Deformation-controlling Technology in Long-distance and Large-span Tunnel(2009-02-015), 2009/09-2010/12
8. Research on Stability of Expansive Soil Slope and Control-Technology of No.106 National Highway in Huangshi.
9. Research and Numerical Analysis on Settlement of Fast-filling and High Embankment on Special Load (2004A101C92),2004/06-2008/12.
10. Research on the Key Construction Technology of Ventilated-well in Shiyashan Tunnel(2007-19), 2007/01-2008/12.
11. Research on the Key Technology of Wuhan Yangtze Tunnel: Research on Protection Technology of Building on the Ground and Underground Pipeline (WHCJSD/KY/04-02-2005), 2005/092-2008/12.
12. Research on Key Technology of Reconstruct Technology of Mountain Highway, 2007.3-2009.12.

Courses Taught

1. Tunnel Engineering (For undergraduate students & graduate students).
2. Survey and Design of Road (For undergraduate students).
3. Road Engineering (For undergraduate students).
4. Roadbed and Pavement Engineering.
5. Construction and Management of Road (For undergraduate students).
6. Pavement Management System (For undergraduate students).
7. Soil Improvement and Treatment Techniques (For undergraduate students).
8. Soil Mechanics and Foundation (For graduate students).
9. Geology in Civil Engineering (For graduate students).
10. Deep Excavation Technology (For undergraduate students).

Project

1. Research on the Faulted Fracture Zone Tunnel Excavation and Restrictive Waterproof and Drainage Technology under the High Water Level(No.201502022),2016/01-2017/12.
2. Research on the Failure Mechanism and Prevention Technology of Pavement Settlement under the Viaduct(2015-44), 2015/12-2017/12.
3. National Science and Technology Supporting Program for “the Eleventh 5-years plan”:Research on Key Geotechnical-Strengthening Technology in Excavation Engineering (2008BAJ06B03-01). 2008/01-2010/12
4. NSFC:Research on the Static and Dynamic Mechanical Properties and Mechanism of Action of the FRP Soil Nail(51278391),2013/01-2017/12.
5. Research on the Construction Monitoring Measurements of High Filling Embankment of Wuhan Tianhe Airport Second Channel Highway. 2011/09-2015/12,
6. Research on the Asphalt Composition Structure of the Aging Resistance Pavement, 2014.4-2015.12
7. Research on Construction Behavior of Surround-rock and Stability of Lining Structure and Deformation-controlling Technology in Long-distance and Large-span Tunnel(2009-02-015), 2009/09-2010/12
8. Research on Stability of Expansive Soil Slope and Control-Technology of No.106 National Highway in Huangshi.
9. Research and Numerical Analysis on Settlement of Fast-filling and High Embankment on Special Load (2004A101C92),2004/06-2008/12.
10. Research on the Key Construction Technology of Ventilated-well in Shiyashan Tunnel(2007-19), 2007/01-2008/12.
11. Research on the Key Technology of Wuhan Yangtze Tunnel: Research on Protection Technology of Building on the Ground and Underground Pipeline (WHCJSD/KY/04-02-2005), 2005/092-2008/12.
12. Research on Key Technology of Reconstruct Technology of Mountain Highway, 2007.3-2009.12.

Awards