Professor

Phone: 13667129780

Email: xql@mail.hust.edu.cn

Academic Areas: Geotechnical Engineering

Research Interests: Geotechnical-Strengthening Technology, Tunnel and Metro Engineering Technology, Pavement and Roadbed Engineering Theory and Technology, Oriented Drilling Trenchless Technology of Underground Pipeline-Laying

Academic Degrees

  • Ph. D. Geological Engineering,1999,China University of Geoscience.

  • M.S. Geotechnical Engineering, 1992,China University of Geoscience.

  • B.S. Exploring Engineering, 1986,Wuhan College of Geology.

Professional Experience

  • 2012/04-Present:Professor & Supervisor for Ph. D.

School of Civil Engineering and Mechanics, HUST

  • 2011/03-2012/03:Vistor & Professor. School of Civil and Environmental Engineering

University of New South Walse, Australia

  • 2001/07-2011/02:Associate Professor / Professor & Supervisor for Ph. D. 

School of Civil Engineering and Mechanics, HUST

  • 1999/08-2001/06:Postdoctoral Research Fellow, Associate Professor

School of Civil Engineering Harbin Institute of Technology, Harbin, P.R.C.

  • 1992/08-1999/07:Lecturer, School of Engineering

China University of Geoscience(Wuhan)P.R.C.

  • 1986/07-1989/09:Construction Engineer

Hubei Irrigating and Power Engineering Co. Ltd. Wuhan, P.R.C.

Selected Publications

  • 1. Research on the Faulted Fracture Zone Tunnel Excavation and Restrictive Waterproof and Drainage Technology under the High Water Level(No.201502022),2016/01-2017/12.

  • 2. Research on the Failure Mechanism and Prevention Technology of Pavement Settlement under the Viaduct(2015-44), 2015/12-2017/12.

  • 3. National Science and Technology Supporting Program for “the Eleventh 5-years plan”:Research on Key Geotechnical-Strengthening Technology in Excavation Engineering (2008BAJ06B03-01). 2008/01-2010/12

  • 4. NSFC:Research on the Static and Dynamic Mechanical Properties and Mechanism of Action of the FRP Soil Nail(51278391),2013/01-2017/12.

  • 5. Research on the Construction Monitoring Measurements of High Filling Embankment of Wuhan Tianhe Airport Second Channel Highway. 2011/09-2015/12,

  • 6. Research on the Asphalt Composition Structure of the Aging Resistance Pavement, 2014.4-2015.12

  • 7. Research on Construction Behavior of Surround-rock and Stability of Lining Structure and Deformation-controlling Technology in Long-distance and Large-span Tunnel(2009-02-015), 2009/09-2010/12

  • 8. Research on Stability of Expansive Soil Slope and Control-Technology of No.106 National Highway in Huangshi.

  • 9. Research and Numerical Analysis on Settlement of Fast-filling and High Embankment on Special Load (2004A101C92),2004/06-2008/12.

  • 10. Research on the Key Construction Technology of Ventilated-well in Shiyashan Tunnel(2007-19), 2007/01-2008/12.

  • 11. Research on the Key Technology of Wuhan Yangtze Tunnel: Research on Protection Technology of Building on the Ground and Underground Pipeline (WHCJSD/KY/04-02-2005), 2005/092-2008/12.

  • 12. Research on Key Technology of Reconstruct Technology of Mountain Highway, 2007.3-2009.12.

Courses Taught

  • 1. Tunnel Engineering (For undergraduate students & graduate students).

  • 2. Survey and Design of Road (For undergraduate students).

  • 3. Road Engineering (For undergraduate students).

  • 4. Roadbed and Pavement Engineering.

  • 5. Construction and Management of Road (For undergraduate students).

  • 6. Pavement Management System (For undergraduate students).

  • 7. Soil Improvement and Treatment Techniques (For undergraduate students).

  • 8. Soil Mechanics and Foundation (For graduate students).

  • 9. Geology in Civil Engineering (For graduate students).

  • 10. Deep Excavation Technology (For undergraduate students).

Project

  • 1. Research on the Faulted Fracture Zone Tunnel Excavation and Restrictive Waterproof and Drainage Technology under the High Water Level(No.201502022),2016/01-2017/12.

  • 2. Research on the Failure Mechanism and Prevention Technology of Pavement Settlement under the Viaduct(2015-44), 2015/12-2017/12.

  • 3. National Science and Technology Supporting Program for “the Eleventh 5-years plan”:Research on Key Geotechnical-Strengthening Technology in Excavation Engineering (2008BAJ06B03-01). 2008/01-2010/12

  • 4. NSFC:Research on the Static and Dynamic Mechanical Properties and Mechanism of Action of the FRP Soil Nail(51278391),2013/01-2017/12.

  • 5. Research on the Construction Monitoring Measurements of High Filling Embankment of Wuhan Tianhe Airport Second Channel Highway. 2011/09-2015/12,

  • 6. Research on the Asphalt Composition Structure of the Aging Resistance Pavement, 2014.4-2015.12

  • 7. Research on Construction Behavior of Surround-rock and Stability of Lining Structure and Deformation-controlling Technology in Long-distance and Large-span Tunnel(2009-02-015), 2009/09-2010/12

  • 8. Research on Stability of Expansive Soil Slope and Control-Technology of No.106 National Highway in Huangshi.

  • 9. Research and Numerical Analysis on Settlement of Fast-filling and High Embankment on Special Load (2004A101C92),2004/06-2008/12.

  • 10. Research on the Key Construction Technology of Ventilated-well in Shiyashan Tunnel(2007-19), 2007/01-2008/12.

  • 11. Research on the Key Technology of Wuhan Yangtze Tunnel: Research on Protection Technology of Building on the Ground and Underground Pipeline (WHCJSD/KY/04-02-2005), 2005/092-2008/12.

  • 12. Research on Key Technology of Reconstruct Technology of Mountain Highway, 2007.3-2009.12.

职称 Phone
Email Academic Areas
Research Interests Academic Degrees
Professional Experience Selected Publications
Courses Taught Project
Awards